Difference between revisions of "Infrastructure assessment"

From TransitWiki
Jump to navigation Jump to search
 
(8 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Category:Capital planning and project delivery]]
+
[[Category:Investment and planning]]
 
 
 
 
  
 
== Introduction ==
 
== Introduction ==
 
+
Agencies tend to select projects that, once constructed, do not generate ridership levels that warrant their construction. In short, many projects are overbuilt and a less costly alternative would satisfy the project need. The selection of capital-intensive projects contributes to cost overruns and can lead to the reputation of infrastructure projects as mismanaged, wasteful investments.  A variety of political, financial, and accounting incentives support the construction of projects whose capacities far exceed demand.  These incentives include political preference for large projects that generate media attention, financing structures that favor capital intensive projects, and accounting structures that inaccurately predict future benefits.
Agencies tend to select projects that, once constructed, do not generate ridership levels that warrant their construction. In short, many project projects are overbuilt and a less costly alternative would satisfy the project need.
 
 
 
A variety of political, financial, and accounting incentives support the construction of projects whose capacities far exceed demand, including:
 
* Overestimated ridership from forecast modeling inputs that do not correspond with actual travel behavior
 
* Unanticipated construction costs
 
* Preference for large, splashy projects
 
* No incentive to manage project costs because others are footing the bill
 
  
 
==Strategies==
 
==Strategies==
 
=== Improve modeling ===
 
=== Improve modeling ===
Adjust forecast year
+
Forecasting models used to calculate future ridership levels rarely correspond with actual travel behavior.  This distorts the benefits attributed to a project in cost/benefit analysis and biases decision-making in favor of projects whose full benefits will not be realized.  Current modeling practices typically forecast travel patterns for a 30 year time period, making it challenging to accurately incorporate changes to local economies that affect travel patterns.  Adjusting the forecast year closer to the present reduces the uncertainty of inputs that affect future travel.
 
 
  
 
=== Improve cost estimation ===
 
=== Improve cost estimation ===
Conduct extensive engineering studies before deciding on alternative
+
Underestimating the cost of capital projects reduces the effectiveness of cost/benefit analysis used in project selection.  Many approaches can improve cost estimates, such as conducting extensive engineering studies before deciding on a preferred alternative to better understand costs associated with each alternative, relying on cost estimate data from previous projects to more accurately predict costs, increasing project transparency to generate stakeholder support and avoid costly changes later in the project development, and establishing a clearly defined scope and schedule to minimize uncertainty and delay.
Reach out to stakeholders
 
Use historical cost estimates as comparison
 
Consistently measure across projects
 
  
 +
==Notes==
 +
===Additional Reading===
 +
Transit Cooperative Research Program. [http://onlinepubs.trb.org/onlinepubs/tcrp/tcrp78/guidebook/tcrp78.pdf|"TCRP Research Results Digest 78: Managing Capital Costs of Major Federally Funded Public Transportation Projects."] 2006.
 +
: The Transit Cooperative Research Program, sponsored by the Federal Transit Administration, conducted a study on "Managing Capital Costs of Major Federally Funded Transportation Projects."  The report contains strategies to better manage costs at all stages of project development.
  
=== Contain project cost ===
+
===References===
Clearly define scope and schedule
+
* Pickrell, D.  "A Desire Named Streetcar."  1992.
Increase cost estimate transparency
 

Latest revision as of 22:31, 10 September 2012


Introduction

Agencies tend to select projects that, once constructed, do not generate ridership levels that warrant their construction. In short, many projects are overbuilt and a less costly alternative would satisfy the project need. The selection of capital-intensive projects contributes to cost overruns and can lead to the reputation of infrastructure projects as mismanaged, wasteful investments. A variety of political, financial, and accounting incentives support the construction of projects whose capacities far exceed demand. These incentives include political preference for large projects that generate media attention, financing structures that favor capital intensive projects, and accounting structures that inaccurately predict future benefits.

Strategies

Improve modeling

Forecasting models used to calculate future ridership levels rarely correspond with actual travel behavior. This distorts the benefits attributed to a project in cost/benefit analysis and biases decision-making in favor of projects whose full benefits will not be realized. Current modeling practices typically forecast travel patterns for a 30 year time period, making it challenging to accurately incorporate changes to local economies that affect travel patterns. Adjusting the forecast year closer to the present reduces the uncertainty of inputs that affect future travel.

Improve cost estimation

Underestimating the cost of capital projects reduces the effectiveness of cost/benefit analysis used in project selection. Many approaches can improve cost estimates, such as conducting extensive engineering studies before deciding on a preferred alternative to better understand costs associated with each alternative, relying on cost estimate data from previous projects to more accurately predict costs, increasing project transparency to generate stakeholder support and avoid costly changes later in the project development, and establishing a clearly defined scope and schedule to minimize uncertainty and delay.

Notes

Additional Reading

Transit Cooperative Research Program. "TCRP Research Results Digest 78: Managing Capital Costs of Major Federally Funded Public Transportation Projects." 2006.

The Transit Cooperative Research Program, sponsored by the Federal Transit Administration, conducted a study on "Managing Capital Costs of Major Federally Funded Transportation Projects." The report contains strategies to better manage costs at all stages of project development.

References

  • Pickrell, D. "A Desire Named Streetcar." 1992.